Search
Leave a Message
Thank you for your message. I will be in touch with you shortly.
Explore My Properties
Background Image

Can You Drill a Well on Your Property in Houston County, GA?

November 14, 2026

Property owners in Houston County, Georgia, can drill a private well, but only with a permit from the Board of Health and only where public water is not available within 200 feet of the residence. Those rules come from the Houston County Health Code, adopted March 7, 2006, and enforced through the county's Environmental Health office in the North Central Health District.

The decision between a well and a county water connection carries real money in 2026. Houston County Water lists a $2,500 connection fee for a one-inch service, and an April 7, 2026 Board of Commissioners agenda item proposed stepping that fee up each year to $6,500 by 2029.

For buyers and sellers of rural homes and acreage around Kathleen, Bonaire, Elko and the outskirts of Perry and Centerville, wells and septic systems are part of the property's value, and they come with their own inspections.

Key Takeaways

•       The Houston County Health Code requires a Board of Health permit to drill, dig or modify a well, with the application made at least 10 days in advance; the permit expires after 12 months (Sec. 703A).

•       A residence must connect to public water if it is available within 200 feet of the residence (Sec. 703C(1)).

•       Wells must be at least 10 feet from property lines, 50 feet from a septic tank and 100 feet from a septic drain field, and preferably 100 feet from a building foundation (Sec. 704).

•       Houston County Water lists a $2,500 connection fee and a $600 meter and installation charge for a one-inch service.

•       An April 7, 2026 Houston County Commissioners agenda item proposed one-inch connection fees of $3,500 in 2027, $4,800 in 2028 and $6,500 in 2029.

Do you need a permit to drill a well in Houston County, GA?

Yes. Section 703A of the Houston County Health Code requires a permit from the Board of Health before a well is drilled, dug or modified. The application must be made at least 10 days before the work, and the permit expires 12 months after it is issued.

The Health Code was adopted March 7, 2006. Amendments since then may not appear in the posted version, so confirm current requirements with Houston County Environmental Health at 98 Cohen Walker Drive, phone 478-218-2020, open weekdays from 8:00 a.m. to 4:30 p.m.

Can you drill a well if county water is available?

Generally no. Section 703C(1) of the Houston County Health Code requires a residence to connect to public water when it is available within 200 feet of the residence. On roads in and around Warner Robins, Perry, Centerville and the more developed parts of Bonaire and Kathleen, a water main nearby can take the well option off the table.

Farther out, especially on larger tracts in south and west Houston County, public water may not reach the home site, and a well becomes the practical choice. The 200-foot distance is measured to the residence, so where the house sits on the lot can change the answer.

How far does a well have to be from a septic system in Houston County?

Section 704 of the Houston County Health Code sets minimum distances between a well and nearby features. These setbacks determine where a well can go and how much of a lot is usable for a house, a septic tank and a drain field.

Houston County well setback distances

Feature

Minimum distance from the well

Health Code section

Property line

10 feet

704

Septic tank

50 feet

704

Septic drain field

100 feet

704

Building foundation

Preferably 100 feet

704

Public water availability that triggers mandatory connection

Within 200 feet of the residence

703C(1)

The 100-foot drain field setback is usually the controlling distance on a rural lot, because the drain field takes up the most space. On a one-acre or two-acre lot in Kathleen or Bonaire, fitting a house, a tank, a drain field and a well with these separations takes planning, and on a narrow lot it may not work at all. That is why the well and septic layout should be sketched with Environmental Health before a buyer closes on land intended for a new home.

How much does it cost to connect to Houston County water instead?

Houston County Water's published fees list a $2,500 connection fee and a $600 meter and installation charge for a one-inch service. For a two-inch service, the connection fee is $5,500 and the meter and installation charge is $3,000.

An item on the April 7, 2026 Houston County Board of Commissioners agenda proposed raising connection fees each year through 2029 to help meet demand and expand the county water system. The agenda copy reviewed does not record the vote, so confirm the adopted schedule with Houston County Water (478-542-2120 in Warner Robins, 478-987-4280 in Perry).

Proposed Houston County water connection fees by year

Year effective

1-inch

2-inch

2026

$2,500

$5,500

2027

$3,500

$6,500

2028

$4,800

$7,800

2029

$6,500

$9,500

If the schedule took effect as proposed, the one-inch connection fee would rise from $2,500 to $6,500 over four years, before the separate meter charge. That changes the math for anyone building in Houston County where both water and a well are options, and it matters most for lots more than 200 feet from a main, where the owner has a choice. Owners planning to build in 2027 or later should confirm the current fee at the time of application.

What septic inspections are available when buying a home in Houston County?

The North Central Health District, which provides Environmental Health services in Houston County, states that pre-purchase site evaluations can be performed. New and upgraded septic systems are inspected and permitted, and all repairs are inspected and permitted.

That means a septic repair discovered during a sale is not a quick fix. It goes through the health department, and the timing should be built into the contract.

What should I have ready when selling a home with a well and septic in Houston County?

Septic repairs in Houston County must be inspected and permitted through Environmental Health, and wells are permitted by the Board of Health, so records from both help a rural sale move.

When I list a home on a well and septic around Kathleen, Bonaire or Perry, I ask for the septic permit or as-built drawing, the last pump-out date and any well records. Buyers and their lenders often want those answers, and having them ready keeps a contract from stalling. If the home is close to county water, I also want to know whether a connection is available, because that comes up with buyers too.

Should I test the well and septic before buying in Houston County?

Buyers of homes on private wells and septic systems in Houston County can request a pre-purchase site evaluation through Environmental Health and should confirm well permits, setbacks and public water availability.

When I work with buyers looking at acreage or older rural homes, a well water test and a septic evaluation go on the due diligence list from day one. If you are buying land to build, I want to know whether county water is within 200 feet of where the house will go, and what the connection fee will be in the year you build. That can shape which lot is the better value.

Frequently Asked Questions

Can you drill a well on your property in Houston County, GA?

Yes, with a permit from the Board of Health under Section 703A of the Houston County Health Code. The application must be made at least 10 days before drilling. The permit expires after 12 months. A residence must connect to public water if it is available within 200 feet.

Do you need a permit to drill a well in Houston County, Georgia?

Yes. The Houston County Health Code requires a Board of Health permit to drill, dig or modify a well. The application must be filed at least 10 days in advance. Houston County Environmental Health is at 98 Cohen Walker Drive and can be reached at 478-218-2020.

Can you have a well if county water is nearby in Houston County?

Section 703C(1) of the Houston County Health Code requires a residence to connect to public water if it is available within 200 feet of the residence. That rule generally rules out a new drinking water well when a main is that close. The distance is measured to the residence. Environmental Health can confirm how the rule applies to a specific lot.

How far does a well need to be from a septic tank in Houston County, GA?

Section 704 of the Houston County Health Code requires a well to be at least 50 feet from a septic tank. The well must also be at least 100 feet from a septic drain field. It must be at least 10 feet from property lines. A distance of 100 feet from a building foundation is preferred.

How long is a Houston County well permit good for?

A well permit issued under Section 703A of the Houston County Health Code expires 12 months after issuance. If drilling does not happen within that time, a new permit is needed. The application must be made at least 10 days before the work. The Health Code was adopted March 7, 2006, so current terms should be confirmed.

How much does it cost to connect to Houston County water?

Houston County Water lists a $2,500 connection fee and a $600 meter and installation charge for a one-inch service. A two-inch service lists a $5,500 connection fee and a $3,000 meter and installation charge. An April 7, 2026 agenda item proposed annual increases through 2029. Current fees should be confirmed with Houston County Water.

Are Houston County water connection fees going up?

An April 7, 2026 Houston County Board of Commissioners agenda item proposed one-inch connection fees of $3,500 in 2027, $4,800 in 2028 and $6,500 in 2029. The item cited demand and expansion of the county water system. The agenda copy does not record the vote. Houston County Water can confirm the adopted schedule.

Can you get a septic inspection before buying a house in Houston County?

The North Central Health District, which provides Environmental Health services in Houston County, states that pre-purchase site evaluations can be performed. Septic repairs must be inspected and permitted. New and upgraded systems are also inspected and permitted. Houston County Environmental Health can explain scheduling.

Do septic repairs need a permit in Houston County, GA?

Yes. The North Central Health District states that all septic repairs are inspected and permitted. On-site system failures, such as sewage on the ground, are investigated. New and upgraded systems are also inspected and permitted.

Who regulates private wells in Houston County, Georgia?

Private wells in Houston County are permitted by the Board of Health under the Houston County Health Code. Environmental Health services are provided through the North Central Health District. The Houston County Environmental Health office is at 98 Cohen Walker Drive. Its hours are weekdays from 8:00 a.m. to 4:30 p.m.

Do well rules differ in Warner Robins, Perry and Kathleen?

The Houston County Health Code applies countywide through the Board of Health. Where a home sits affects whether public water is within 200 feet, which is more likely in developed parts of Warner Robins, Perry and Centerville. Rural parts of Kathleen, Bonaire and Elko may rely on wells. Neighboring Byron is in Peach County, so Houston County rules do not apply there.

 

About the Author

William Walton-Dean is a licensed REALTOR® with Walton Dean Realty, operating under Real Broker LLC, serving buyers and sellers across Houston County, Georgia, including Perry, Warner Robins, Bonaire, Kathleen, Byron, and the surrounding Middle Georgia housing market. He brings a data-driven, hyper-local approach to both residential and commercial transactions, working with first-time buyers, move-up sellers, investors, and families relocating to the area, including those tied to Robins Air Force Base. Drawing on a prior career as a C-level executive, he helps buyers and sellers at every price point make clear, confident decisions backed by real market insight.

📱 478-371-7069

Walton Dean Realty | Real Broker LLC

Buying or Selling in Houston County? Let's Talk Well, Septic and Water Before You Commit

If you are buying land or a rural home around Kathleen, Bonaire, Perry or Centerville, I can help you line up the well, septic and water questions before your due diligence clock runs out. Reach out and we will make sure the property works the way you need it to.

William Walton-Dean | Walton Dean Realty

📱 478-371-7069

📧 [email protected]

A More Strategic Approach to Real Estate

Disclaimer: This article is for general information only and is not legal, health or engineering advice. The posted Houston County Health Code dates to 2006 and fees change. Confirm well, septic and water connection requirements with Houston County Environmental Health, Houston County Water, or a licensed well driller before you buy or build.

EXPLORE OTHER

Recent Blog Posts

Follow Me On Instagram